Gitxsan Government Demands Rail Halt Following Skeena River Derailment

The Gitxsan Huwilp Government in British Columbia has issued a demand for the immediate cessation of all train hauling operations through its traditional territory and fishing waterways. The call follows a significant rail derailment that occurred on Tuesday, approximately 15 kilometers west of Terrace, which sent railcars loaded with forest products into the Skeena River and resulted in a diesel spill.
Hereditary Chief Toby Howard stated that the incident underscores the severe risks inherent in current rail transportation practices within the region, noting that the infrastructure involves a 103-year-old track. “A 103-year-old track has created dangerous conditions for the rail system in our territory,” Howard said in a statement. He further insisted that the hauling of any materials—whether hazardous, human, or otherwise—must stop until CN Rail can provide a guarantee regarding the safety of the rail line.
The accident marks the second such event in eight months. In March, a mudslide caused grain cars to derail along the same river system south of Prince Rupert, an event that resulted in the spill of nearly 8,000 liters of diesel fuel. Regarding the most recent incident, CN Rail confirmed that two locomotives and five railcars were involved. The company stated that it appears a rock slide triggered the derailment.
While CN Rail announced on Thursday that the track had been repaired and regular train traffic had resumed, the company maintains that specialized environmental response teams remain on-site. These crews are working to contain and recover the spilled diesel and remove the derailed equipment from the water. The company noted that two crew members who sustained injuries during the accident were hospitalized but have since been released.
The Gitxsan Huwilp Government has voiced concerns that the derailment occurred within an area susceptible to ocean tides, posing a potential threat to the entire ecosystem. According to the First Nation, hereditary chiefs had previously reached out to the provincial government with an offer to assist in identifying vulnerable sections of the line, but that offer was dismissed by the Transportation Ministry.
Highlighting the urgency of the situation, Chief Howard emphasized the need for a comprehensive inspection of the entire railway stretch from Burns Lake to Prince Rupert to ensure the safety of the Gitxsan people. As of the latest update, CN Rail had not provided a response to the nation’s specific demand to halt hauling operations in the territory.