Pakistan’s New Hangor-Class Submarines Face Uncertainty Over Unproven Chinese Engines

Pakistan’s newly commissioned Hangor-class submarine fleet has officially commenced service, with the lead vessel, PNS Hangor, arriving in Karachi on June 11, 2026, following its commissioning in Sanya on April 30, 2026. While the arrival marks a milestone for the Pakistani Navy, the fleet’s technical specifications have drawn scrutiny due to the use of the Chinese-made CHD620 diesel engine.
The adoption of the CHD620 follows a major procurement pivot necessitated by the German government’s refusal to issue export licenses for the MTU 396 engines originally intended for the submarines. Under the terms of the agreement, Pakistan is slated to integrate four CHD620 diesel engines into each of the eight vessels planned for the Hangor class. The full induction of the fleet is expected to span from 2028 through 2030.
Unlike the MTU 396, which is utilized by navies in countries such as Greece, South Korea, Portugal, and Turkey, the CHD620 engine has no established history in operational submarine service. Navies operating the Type 124 submarines have benefited from extensive maintenance data and documented patrol experiences regarding engine wear, failure rates, and overhaul requirements. The CHD620, conversely, lacks this operational track record, creating a vacuum of practical data for the Pakistani Navy.
While China has cited over 6,000 hours of bench testing to support the engine’s certification—a standard also used for Thailand’s S26T submarine acquisition—experts distinguish between controlled laboratory testing and actual marine deployment. Submarine engines operate under unique environmental stressors, including high humidity, confined spaces, and rapidly varying loads during high-speed maneuvers or rapid battery charging. Further, snorkel operations, which draw air through a mast, can be subject to interference from heavy waves, and military operations expose components to the shockwaves and physical stresses of combat.
Concerns regarding the engine’s reliability have been noted by naval observers. In 2024, a former U.S. Navy submariner projected that the Chinese engines might require frequent repairs and exhibit reliability issues after a relatively small number of operational hours. While the PNS Hangor demonstrated a live-fire capability by launching an anti-ship missile in September 2026, analysts suggest this exercise does not address the engine’s durability over months of deployment in hostile waters.
The reliance on the CHD620 also creates potential logistical challenges. Pakistan remains dependent on China for spare parts, technical training, and major overhauls, as the Karachi Shipyard continues to develop its in-house maintenance capacity. The reliance on a single engine type for all eight vessels presents an additional risk: any common design flaw identified in the CHD620 could theoretically force a fleet-wide shutdown for investigation and repairs.
Financial implications are also present for the Pakistani Navy, which must allocate resources for fuel, training, and maintenance. Unforeseen mechanical problems could place additional strain on these budgets and reduce the number of vessels available for active duty. Furthermore, there is the potential for an impact on crew confidence; if submariners harbor doubts regarding the reliability of their propulsion systems, it could limit the fleet’s willingness to perform high-speed maneuvers or extend the duration of patrols. As of now, Pakistan has not publicly commented on the transition to the CHD620 engine.